Inofia Tri-Fold Memory Foam Mattress
6.5/10The Inofia Tri-Fold is a 15cm folding memory foam mattress with a removable cover,…
Firmness: Medium soft100-night sleep trial
A 10cm tri-fold mattress with a 3cm gel memory foam top and zip-off washable cover, for guests, sleepovers and camping.
The Vesgantti Tri-Fold Gel Memory Foam Folding Mattress is a 10cm foam mattress that folds into three sections for storage, then opens flat on the floor as a guest bed or folds into a low seat. On Vesgantti’s own UK shop it costs £104.99 in a 75 x 190cm small single and £114.99 in a 90 x 190cm single at the time of writing (October 2026).
Inside are two layers: 3cm of gel-infused memory foam on top and 7cm of high-density base foam, wrapped in an inner protective cover and a zipped knitted outer cover that can go in the washing machine. The underside has an anti-slip fabric to stop it sliding on laminate. Vesgantti describes the feel as medium, which is what a thin memory foam top over a firm base usually gives. A 15cm version with a 12cm base layer is sold on the same page.
| Vesgantti 10cm size | Dimensions | Price |
|---|---|---|
| Small single | 75 x 190 x 10cm | £104.99 |
| Single | 90 x 190 x 10cm | £114.99 |
| Small double | 120 x 190 x 10cm | £124.99 |
Vesgantti states its foam is CertiPUR-US certified; that programme requires low VOC emissions of less than 0.5 parts per million for indoor air quality. Its returns page offers 100 nights from delivery, but asks you to keep the mattress for at least 21 nights and to return it clean and undamaged. The seller is SONIX TRADING LIMITED, a company registered at Companies House in March 2021.
At 10cm the Vesgantti is a mattress for a few nights at a time: children’s sleepovers, a guest on the floor, camping or a campervan. A heavier adult will press through to the base foam quickly, and the 10cm double (135 x 190cm) was sold out when we checked.
| Brand | Vesgantti |
|---|---|
| Material | 3cm gel-infused memory foam over 7cm high-density base foam, inner protective cover, zipped knitted outer cover that is machine washable, anti-slip base fabric. Folds in three. |
| Firmness | Medium (5/10) |
| Height | 10 cm |
| Sleep trial | 100 nights |
| Warranty | 10 years |
| Delivery | Free delivery, arrives compressed |
| Available sizes | 75x190, 90x190, 120x190 |
| Overall score | 6.3/10 |
| Certifications | CertiPUR-US |
“The Vesgantti is a sensible way to add a spare bed for little money: the gel memory foam top takes the edge off a hard floor and the cover washes easily after a sleepover. Keep it for occasional nights, because 10cm of foam is not enough for an adult to sleep on every night.”Get the best price →
The Inofia Tri-Fold is a 15cm folding memory foam mattress with a removable cover,…
Firmness: Medium soft
The top cooling pillowtop in Aspire's range: 7,000 springs, wool filling and Cool Blue…
Firmness: Medium firm
A hand-tufted 7,000-spring pillowtop with a wool, cashmere and silk blend, for sleepers who…
Firmness: Medium firm